Things are moving along, although we've had some unexpected issues. The mirrored medicine cabinet Mark ordered is HUGE, almost twice the size of the old one. So Farid had to cut an extra-wide space for it and relocate the electrical outlet below it (you can see the blue outline):


There was also some wonky plumbing behind the old vanity. The pipes ran along the concrete wall and had some fairly large bends in them. We're having them recessed and replaced with new copper:


The tiling and grouting is done in the shower area. As you can see, we have the same tile from the hall bath on most surfaces, except the shower floor. There we have river-rock tile: